Gothic portal after renovation. Damaged ceramic fittings of the frame were replaced. New special shape bricks for renovation works were molded by hand from pure clay based on an original historical sample. Because the frame brick is large, it required longer drying time. Putting a wet brick into a kiln would cause it to crack during firing. Delivery time 14 weeks.